Reduce carbon emissions by 10% by 2019
& 15% by 2021 against 2017 baseline:

Co² emissions 2017 = 63.12kg Co² per ton of product
Gas Co² emissions 2017 = 26.50kg Co² per ton of product
Electricity Co² emissions 2017 = 36.62kg Co² per ton of product

Energy Review

Map Energy consumption by application on site

Evaluate historic and current energy consumption
Bracket
Analyse Energy Use
Bracket
Target future energy consumption
IDENTIFY
Areas of wastage & solutions

Whole life environmental impact of new equipment to be considered
Bracket
Action Energy Use
Bracket
Action energy saving opportunities and monitor impact.

Communicate at all levels
Consider: Energy efficient technology and solutions
OPPORTUNITIES
Identify; Prioritise; Record
Objectives & Targets

Energy Objectives, Targets and Action Plans 2018

Manufacturing Objectives & Targets
  • Warehouse Lighting
  • Reduce Compressed Air Usage
  • Reduce Compressed Air Usage
  • Implement start & shutdown procedure for all plant equipment
  • Steam Lagging
  • Improve Operator Understanding / Awareness of Energy

Warehouse Lighting

Objective
Replace inefficient 250w sodium lamps with more efficient lights
Target
Replace all metal halide lighting with LED
Work to be undertaken
Site Electrician
Target Date
September 2018
ACTIONED

Reduce Compressed Air Usage

Objective
Identify current air leaks and promote a proactive encouragement of leak detection.
Target
All areas to be tested via Ultrasonic detector 2x pa and leaks actioned within 1x month
Work to be undertaken
Production Manager/Site Engineer
Target Date
September 2018
STARTED

Reduce Compressed Air Usage

Objective
Minimise wasted compressed air from desiccant dryer
Target
Install dew point control
Work to be undertaken
Engineering Manager/Site Engineer
Target Date
April 2018
ACTIONED

Implement start & shutdown procedure for all plant equipment

Objective
Minimise baseload energy consumption outside production hours
Target
< 60kW/hr of electricity usage
Work to be undertaken
Engineering Manager/Site Engineer
Target Date
February 2018
ACTIONED

Steam Lagging

Objective
Reduce thermal losses
Target
Lag all steam pipes & valves
Work to be undertaken
Engineering Manager/Site Engineer
Target Date
July 2018
SUPPLIER EVALUATION

Improve Operator Understanding / Awareness of Energy

Objective
Hold workshops on site with operators involved in significant energy use areas of the process
Target
All operators to have received basic instruction (weekly Brief, Tool box understanding)
Heading 3
Production Manager/Site Engineer
Target Date
August 2018
NOT STARTED